13 Nov '08
Energy firm Generatsiya Urala has announced plans to earmark $14.7m for relocation of the facilities of Bereznikovskaya Thermal Power Plant No. 10 in Perm regionþ
The relocation was caused by building a 2.5-kilometer railway circuit as part of remediation of technogenic accident at a abraum salt mine, reported sources.
The move is scheduled for completion within three months.
Generatsiya Urala is a division of Moscow-based KES Holding.