Urals | Energy, utilities

MES West Siberia to build $96m substation in Yamalo-Nenets District

12 May '11
Interregional grid operator MES West Siberia has started construction of a $96m 220 kV Mangazeya substation in Yamalo-Nenets Autonomous District, the company reports.

The new substation is reportedly to supply energy to Vankorsky group of oil and gas deposits.

Under plans, the substation is to be equipped with 110 and 220 kV SF-6-insulated open switchgears with, two transformers with power capacity of 125 MVA each, voltage transformers, high-frequency chokes, excess-voltage suppressor, access ways for 220 kV power line Urengoyskaya GRES Mangazeya.

Construction of the substation is scheduled to be completed in 2012.

MES West Siberia is a part of national grid operator FSK UES.
Publish in Twitter
Write to Facebook
Google Buzz
Write to LiveJournal
Show in MM
Share MK
COMMENT ON THIS STORY
Find Related Content

Tags: MES West Siberia (6) / FSK UES (177) / Mangazeya substation (0) /

Latest News: Urals
17 Jan '20 | Industry, manufacturing | Technology & innovation
20 May '19 | Technology & innovation
16 Nov '17 | Finance, business | Technology & innovation
1 Mar '17 | Technology & innovation | Industry, manufacturing
 

Feature stories

25 Dec '19
Scientists in Siberia have come up with their own...
8 Nov '19
For the first time in the history of Russian-African...
29 Oct '19
Search (News archive - 21793)
Advertising
AIM_Congress
Advertising
NATT
Advertising
Venture_Russia_2018
Advertising
Marchmont News

Latest News

20 Feb '20
Many investors rightly reckon that Russian start-ups...
18 Feb '20
Earlier today SberDevaisy launched sales of its...
14 Feb '20
MTS, one of Russias top four mobile telecom...

Most read stories from last week

20 Feb '20
Many investors rightly reckon that Russian start-ups...